Huawei SUN2000-50KTL-M0 Quick Manual page 15

Hide thumbs Also See for SUN2000-50KTL-M0:
Table of Contents

Advertisement

When connecting the shielded cable, choose whether to crimp the OT terminal based on site
requirements.
Tie the communication cables with the cables on internal side of the maintenance compartment.
6. Tighten the thread-lock sealing nut and seal the cable gland.
RJ45 Network Port Connection
1. Prepare an RJ45 connector.
No. Color
1
White-and-orange
2
Orange
3
White-and-green
4
Blue
5
White-and-blue
6
Green
7
White-and-brown
8
Brown
3. Insert the RJ45 connector into the RJ45 network
port in the SUN2000 maintenance compartment.
Pin Definition
RS485A, RS485
differential signal+
RS485B, RS485
differential signal–
N/A
RS485A, RS485
differential signal+
RS485B, RS485
differential signal–
N/A
N/A
N/A
2. Route the cable through the cable gland.
4. Bind the communications cable.
14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000 seriesSun2000-60ktl-m0Sun2000-65ktl-m0

Table of Contents