Warning
This section provides the information needed to install
the HP 11757B Multipath Fading Simulator. Included
is information pertinent to initial inspection, power
requirements, line voltage selection, power cables,
interconnection, environment, instrument mounting,
storage, and shipment. In addition, this section contains
the procedures for selecting the impedance of the
instrument inputs and setting the HP-IB address.
To avoid hazardous electrical shock, do not turn on the
instrument when there are signs of shipping damage
to any portion of the outer enclosure (covers, panels,
display).
Inspect the shipping container for damage. If the
shipping container or cushioning material is damaged, it
should be kept until the contents of the shipment have
been checked for completeness and the instrument has
been checked mechanically and electrically. Procedures
for checking electrical performance are given in the
service manual as well as in the automated performance
tests found in this manual. If the contents are
incomplete, if there is mechanical damage or defect, or if
the instrument does not pass the electrical performance