View Content Details; Dcp Ingest Status; View Ingest Job Details; Pause/Resume Jobs - Sony LMT-300 User Manual

Screen management system projectionist terminal
Hide thumbs Also See for LMT-300:
Table of Contents

Advertisement

View Content Details

To view detail information for a specific CPL, locate the
specific Content in the list. If the Title of interest is not
visible, tap either Scroll Up
the specific Title is found. Once the Title has been located,
tap to select the Content Title and then tap Details. The
CONTENT DETAILS pane appears.
The CONTENT
Content Title
DETAILS popup
contains selected
information about
the Content (CPL).
In addition to the
Content Title and its
unique
identification
(UUID) Content
Details includes the
following; Content
Type, e.g., Feature,
Duration, Image
and Audio Formats,
Aspect Ratio, # of Reels, # Channels (Audio), Track
Status, and if the CPL is encrypted. Newly added Content
Details are; Language, Subtitle and 3D.
To close the CONTENT DETAILS popup, tap Close

DCP Ingest Status

A Digital Cinema
Tap DCP Ingest Status
Package must be
ingested into the RAID
storage system under
control of the Media
Block prior to it being
available for
presentation.
Because an individual
ingest job can require
considerable time and
multiple ingest jobs may
be pending, the ability to
view the status of the
processes is available
from one of the Content Menus. In addition, DCP queued
for Ingest can now be managed from the Projectionist
Terminal. To view the status of the DCP Ingest processes,
or Scroll Down
until
Close
Content Details
.
Content Menu
tap Menu, tap Content and then tap DCP Ingest Status.
The DCP INGEST STATUS pane appears.
Ingesting
Selected
Details
Remove Job
Ingest Complete (100%)
and DCP Validated
Ingest in progress
Ingest Completed (100%)
Verification in process
From the DCP INGEST STATUS pane you can view the
status of and manage selected ingest processes. During
ingest the percentage of completion is shown adjacent to
the ingesting icon
. A solid green status indicates that
Ingest is complete (100%) and the DCP has been
Validated. A yellow status (flashing) indicates that
Validation is in progress.

View Ingest Job Details

To view Details of
the selected ingest
process, tap
Details. The
INGEST DETAILS
popup appears
containing
information about
the status of the
selected job. The
INGEST DETAILS popup also indicates if the DCP Ingest
job has completed and whether the DCP was Validated.
Tap the Close icon to return to DCP INGEST STATUS.

Pause/Resume Jobs

An alternate action control which allows you to manually
Pause Jobs and Resume Jobs queued for DCP Ingest. A
confirmation message appears.
Note: While Ingest jobs may be scheduled to run during
coincident with Playback, the Ingest process is
Complete &
Validated
Pause Jobs
Cancel Job
Content
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents