Installation
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
1
Preparing the Machine
No Parts Required
Procedure
Park the machine to a level surface, engage the parking brake,
shut off the engine, and remove the key from the key switch.
Disconnect the battery; refer to the Operator's Manual.
Description
No parts required
Bracket
Bolt (5/16 x 1 inch)
Washer (3/8 inch)
Nut (5/16 inch)
Foam marker (sold separately)
Carriage bolt
U-bolt
Flange nuts (3/8 inch)
Spacer
R-clamp
Wire harness
Switch bracket
Rocker switch
Paddle switch
Bolts (M6)
Fuse, 15 amp
Qty.
–
Prepare the machine.
1
4
Install the foam-marker compressor on
4
the bracket.
4
1
1
1
3
Install the finishing kit bracket.
1
1
1
1
1
Route the wire harness and install the
switches.
1
4
1
2
Use