Installation
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Description
No parts required
No parts required
No parts required
No parts required
No parts required
No parts required
No parts required
Cable ties
3-pin adapter
4-pin adapter
Agitation, rate, and master-spray
manifold
Section valve manifold
Flow-meter hose—25 x 289 mm (1 x
11-3/8 inches)
No parts required
Handle
Screw (6-32 x 5/8 inch)
Agitation throttle valve
Bracket (nylon)
Agitation-valve bracket
Bolt (6 x 12 mm)
Eductor-shutoff valve
Eductor-shutoff bracket
Flange locknut (1/4 inch)
Flange-head bolt (5/16 x 3/4 inch)
Agitation-nozzle assembly
Return hose—2.5 x 72 cm (1 x 27-7/8
inches)
Agitation supply hose—2.5 x 72 cm (1 x
28-1/4 inches)
Bypass hose—2.5 x 110 cm (1 x 43-1/2
inches)—machines without the optional
spray wand or electric hose reel kit
Qty.
–
Prepare to install the kit.
–
Disconnecting the pressure-sense tube.
Disconnect the wire harness from the
–
valves.
–
Disconnect the optional attachments.
–
Remove the boom-section valves.
–
Remove the agitation nozzles.
Remove the agitation, rate, and
–
master-spray valves.
6
5
Replace the valve electrical connectors.
1
1
Install the valve assemblies.
1
1
Install the flow meter and hoses.
–
Connect the wire harness.
1
1
1
1
Installing the agitation throttle valve and
1
eductor–shutoff valve for machines with
4
the optional eductor kit.
1
1
4
2
Installing the agitation-nozzle assembly
1
and hoses.
1
1
Install the return hose, agitation supply
hose, and bypass hose.
1
3
Use