Verify Component Operation; Install A Qualified Sfp Option Into An Ds2200 Fc/Iscsi Controller Module - Lenovo ThinkSystem DS Series Hardware Installation And Maintenance Manual

Table of Contents

Advertisement

Canister face plate
Align SFP for installation
(plug removed/actuator open)
Figure 107 Install a qualified SFP option into an DS2200 FC/iSCSI controller module

Verify component operation

View the CNC port Link Status/Link Activity LED on the controller canister face plate. A green LED indicates that
the port is connected and the link is up:
For FC SFPs, see
For 10GbE iSCSI SFPs, see
For 1Gb iSCSI SFPs, see
NOTE: To remove an external SFP connector, perform the installation steps in reverse order relative to what is
described in
"Install an SFP transceiver" (page
Target CNC port
Figure 37 (page
45)or
Figure 41 (page
Figure 37 (page 45)
Figure 38 (page 46)
Fiber-optic interface cable
49), and refer to table entry No.1
or
Figure 41 (page
49), and refer to table entry No.2
or
Figure 41 (page
49), and refer to table entry No.2
156).
Installed SFP
(actuator closed)
Verify component operation
157

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents