3-The Storage Management Console is introduced in
additional information.
Planning for installation
Before beginning the enclosure installation, familiarize yourself with the system configuration requirements. The
figures listed below show the locations for each plug-in module:
•
2U12 front panel: see
•
2U24 front panel: see
•
2U controller enclosure rear panel: see
•
2U expansion enclosure rear panel: see
•
5U front panel: see
•
5U expansion enclosure rear panel: see
IMPORTANT: Installation work should be performed by qualified service personnel.
Table 10 Storage system configuration
Module type
Drive carrier
modules
DDIC
Power cooling
modules
Power supply
unit modules
Fan cooling
modules
I/O modules
NOTE: Whether 2U or 5U, DS EXP enclosures use a common expansion module. See
Preparing for installation
NOTE: Enclosure configurations
•
2U enclosures are delivered with CRUs and all drive carrier modules installed.
•
5U enclosures are delivered with many CRUs installed; however, DDICs must be installed during system setup.
CAUTION: Lifting enclosures
•
A 2U enclosure—together will all its component parts—is too heavy for one person to lift and install into the
rack cabinet. Two people are required to safely move a 2U enclosure.
60
Installation
Figure 10 (page 26)
Figure 11 (page 26)
Figure 25 (page 33)
Location
Description
2U Front
All drive slots must hold either a drive carrier or dummy drive carrier module.
panel
Empty slots are not allowed. At least one disk must be installed.
5U Front
Maximum 84 disks are installed (42 disks per drawer)
panel
Minimum 14 disks are required. Follow drawer population rules on
drawers
2U Rear
Two PCMs provide full power redundancy, allowing the system to continue to
panel
operate while a faulty PCM is replaced.
5U Rear
Two PSUs provide full power redundancy, allowing the system to continue to
panel
operate while a faulty PSU is replaced.
5U rear panel Five FCMs provide airflow circulation, maintaining all system components
below the maximum temperature allowed.
Rear panel
Two IOMs must be installed for this configuration (RBOD and EBOD).
"Accessing the SMC" (page
94). See the Storage Manager Guide or online help for
Figure 12 (page 27)
Figure 16 (page 27)
(product option)
(eBezel) and
Figure 26 (page 33)
Figure 27 (page 34)
(product option)
(drawer with slot index)
page
Figure 21 (page
57.
29).