Work Light Kit
RT1200 Trencher
Model No. 25464
Model No. 25464E
This product contains a chemical or chemicals known to the State of California to
Loose Parts
Use the chart below to verify that all parts have been shipped.
Description
Wiring harness
Work light
Routing the Wiring Harness
1. Connect the 4-pin connector of the wiring harness to
the 4-socket connector of the machine harness under
the dashboard (Figure 1).
1. 4-pin connector
2. Move the harness down and to the left from under the
dashboard.
3. Route the harness along the kick-plate panel and the
steering-console panel, and secure the harness with the
magnetic tie-mount wraps (Figure 2).
© 2014—The Toro® Company
8111 Lyndale Avenue South
Bloomington, MN 55420
Proposition 65 Warning
cause cancer, birth defects, or reproductive harm.
Figure 1
2. 4-socket connector
Register at www.Toro.com.
WARNING
CALIFORNIA
Qty.
1
Route the wiring harness.
4
Install the work lights.
1. Steering-console panel
2. Magnetic tie-mount wraps
4. Route the harness along the inside of the ROPS-post
tube, and secure the harness with the magnetic
tie-mount wraps (Figure 3).
Form No. 3378-114 Rev A
Installation Instructions
Use
Figure 2
3. Wiring harness
4. Kick-plate panel
Original Instructions (EN)
All Rights Reserved *3378-114* A
Printed in the USA