7.2
Battery Cabinet Clearance
Maintain the indicated clearance during installation. See Figure 7.1. Ensure that the front and top air vents
are NOT blocked.
FIGURE 7.1
16
Side Clearance
15-100kVA: 0 in (0 mm)
CLEARANCE FOR BATTERY CABINET USING LEVELING FEET
Side Clearance
15-100kVA: 0 in (0 mm)
FIGURE 7.2
CLEARANCE FOR SEISMIC INSTALLATIONS
4400 Series UPS Battery Cabinet Installation and Operation Manual – 69445-005
Top 16 in
(406 mm)
Front
44 in
(1118 mm)
Back Clearance
15-100kVA: 0 in (0 mm)
Top 16 in
(406 mm)
Front
44 in
(1118 mm)
Back Clearance
15-100kVA: 0 in (0 mm)