Connection Diagram - LG ESS Home 10 Installation Manual

Energy storage system
Hide thumbs Also See for ESS Home 10:
Table of Contents

Advertisement

CAUTION
The electrical installation of these PCS and battery must only be performed by electricians or
When removing the cover, make sure not to damage connection components.
Refer to the ATS BOX manual at the following site for detailed information on installing ATS
BOX.
https://www.lg.com/global/business/ess/residential/dc-8-10

Connection Diagram

GRID
Batt
PE
L1
3
L2
Power
L3
Meter
N
L1 L2 L3 N
Battery 2
Battery 1
+
-
BMS2
Battery2
BMS 1
PCS
A
B
A
B
L1
L1
3
L2
L2
Energy
L3
L3
Meter
N
N
PV Array
PV Array
PV Array
#1
#2
#3
+
-
PV1+ PV1-
PV2+ PV2-
PV3+ PV3-
Battery1
PV
LG ESS PCS
ATS
Grid
Comm.
1
2
3
N
L1 L2 L3 N
23
Installation
Critical Load
Load Output
Output
L1 L2 L3 N
L1 L2 L3 N
ATS
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ess home 8

Table of Contents