LG ESS Home 10 Installation Manual page 49

Energy storage system
Hide thumbs Also See for ESS Home 10:
Table of Contents

Advertisement

[Operating Test] Settings
does not work.
The result is displayed when each test is completed. When there is no problem with the test,
information. Check and solve the error referring to the error code in the information, and perform
63.
NOTE
The operating test is a step to verify the PCS status for solar power generation and battery
charging / discharging.
It is recommended to proceed when the battery SOC is more than 20 % and the solar radiation
operating test menu is displayed.
You should perform 4 operating tests. To start
automatically.
You can also run tests separately by tapping
It is recommended to run all the tests at once
Charging (from Grid) :
The operating test for battery
charging through grid.
Charging (from PV) :
The operating test for battery
charging through PV.
Discharging:
The operating test for battery
discharging to grid.
Inverter :
The operating test for
power.
49
Settings
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ess home 8

Table of Contents