Panasonic PAW-160MAH2L Installation Instructions Manual page 95

Air handling unit kit for panasonic ecoi; panasonic eco g; panasonic paci
Table of Contents

Advertisement

6. Remove the AHU Kit's upper mounting board.
7. On the CZ-CAPBC2 PCB (ACC-SP1A), located on the rear side of the upper mounting board
inside the AHU Kit enclosure, make sure that switches S1 to S4 are set as follows:
a. S1: Set to "OFF-ON-OFF-ON" (factory default on AHU Kit)
b. S2: All jumpers are intact, i e. no jumper has been cut. Also make sure, that the bridge
connector between terminals "M2-5" and "M2-6" (FREE) on the AHU kit's terminal con-
nector of section F has not been removed.
c. S3: Set to "VOLTAGE" or "NO VOLTAGE", depending on the local digital input (DI) confi -
guration.
Control via dry contacts (factory default)
= "NO VOLTAGE"
Control via 12 – 24 V DC signals
= "VOLTAGE"
12 –24 V DC
Control
GND
93

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents