Siemens SONOLINE G20 Installation Instructions Manual page 8

Hide thumbs Also See for SONOLINE G20:
Table of Contents

Advertisement

8
6. Install the two roll-out ramps.
- Place the two ramps on the ramp studs.
The ramps studs are located on the front side of the shipping crate. The ramp planks
have one hole at the end that is placed on the floor and two holes at the end that is
placed on the ramp stud.
Fig. 3:
7. Unfold and lay flat the cardboard shipping base.
Fig. 4:
8. Remove the plastic cover from the ultrasound system.
9. Roll the system off the shipping pallet.
- Disengage the brakes on each wheel.
- Carefully roll the system off the shipping pallet, down the ramps previously installed,
and on to the floor.
10. Go to the next section for instructions to power on and verify the ultrasound system.
SONOLINE G20
SONOLINE G20 System Delivery Procedure
Ramp Plank Placement
Shipping Base Cardboard
US06-101.812.01.02.02
10.04
Page 8 of 26