Fujitsu ETERNUS AB Series Maintaining Hardware page 75

Hide thumbs Also See for ETERNUS AB Series:
Table of Contents

Advertisement

In this command, filename is the file path and file name to which you want to save the database.
Enclose the file name in double quotation marks (" "). For example:
file="C:\Program Files\CLI\logs\dbmdata.zip"
This command does not automatically append a file extension to the saved file. You must specify a file
extension when entering the file name.
e) Select Tools > Verify and Execute.
3. Collect support data for your storage array using SANtricity System Manager.
a. Select Support > Support Center > Diagnostics.
b. Select Collect Support Data.
c. Click Collect.
The file is saved in the Downloads folder for your browser with the name support-data.7z.
4. Ensure that no I/O operations are occurring between the storage array and all connected hosts. For
example, you can perform these steps:
• Stop all processes that involve the LUNs mapped from the storage to the hosts.
• Ensure that no applications are writing data to any LUNs mapped from the storage to the hosts.
• Unmount all file systems associated with volumes on the array.
Note: The exact steps to stop host I/O operations depend on the host operating system and the
configuration, which are beyond the scope of these instructions. If you are not sure how to stop host I/O
operations in your environment, consider shutting down the host.
Attention: Possible data loss – If you continue this procedure while I/O operations are occurring,
the host application might lose access to the data because the storage is not accessible.
5. If the storage array participates in a mirroring relationship, stop all host I/O operations on the secondary
storage array.
6. Wait for any data in cache memory to be written to the drives.
The green Cache Active LED on the back of each controller is on when cached data needs to be written to
the drives. You must wait for this LED to turn off.
Cache Active LED
7. From the Home page of SANtricity System Manager, select View Operations in Progress. Wait for all
operations to complete before continuing with the next step.
8. Power down the controller shelf.
a) Turn off both power switches on the controller shelf.
b) Wait for all LEDs on the controller shelf to turn off.
What to do next
Go to
Upgrade host interface
card.
 |  Host interface cards  |
75

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus hb seriesEternus hb5000Eternus hb2000

Table of Contents