Huawei NE05E Series Quick Installation Manual

Huawei NE05E Series Quick Installation Manual

Mid-end router
Hide thumbs Also See for NE05E Series:

Advertisement

Quick Links

NE05E&NE08E Series Mid-End Router
Quick Installation Guide
(IMB Cabinet)
Issue: 05
Date: 2016-06-30
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

loading

Summary of Contents for Huawei NE05E Series

  • Page 1 NE05E&NE08E Series Mid-End Router Quick Installation Guide (IMB Cabinet) Issue: 05 Date: 2016-06-30 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: Installation Flow

    Installation Flow Start Page 1 Precautions Preparation installation Tools for Installation Page 2 Pages Introduction to the 1U- height Chassis Introduction to the 2U- Overview of IMB Page 6 Page 5 height Chassis Installation Clearance Pages Pages Introduction to IMB Requirements (Indoor Mini Box) Introduction to AC/DC...
  • Page 4 Precautions NOTE This document provides simple and distinctive guidelines for quick hardware installation of the NE05E&NE08E(NE05E-S2/SE/SF/SG/SH/SI/SQ&NE08E-S6/S6E). Based on the height of a device, the NE05E-S2/SE/SF/SG/SH/SI/SQ are considered 1 U devices, and the NE08E-S6/S6E are considered 2 U devices. 1 U = 44.45 mm (1.75 in.) As the installation methods are similar, the fixed NE05E-SI is used as an example for the 1 U device, and the card-inserted NE08E-S6 is used as an example for the 2 U device.
  • Page 5: Tools For Installation

    Tools for Installation Philips Screwdriver Flathead Screwdriver Tape Measure Level Rubber hammer (M2-M6) (M2-M6) Wire Stripper Cable Cutter Ratchet Crimp Tool Torque Wrench Percussion Drill Network Cable Coax Stripper ESD Gloves Diagonal Pliers Antistatic Wrist Strap Crimping Pliers Paper Knife Multimeter Cable Tester Marker Pen...
  • Page 6 Introduction to the 1U-height Chassis NE05E-S2 NM interface Power supply interface PGND point Antistatic jack interface (Console interface) Clock and time interface FE/GE optical Alarm interface GE optical interface interface SHDSL interface FE/GE electrical interface T1 interface NE05E-SE/NE05E-SF PGND point 10GE optical interface Power supply interface NM interface...
  • Page 7 NE05E-SG/NE05E-SH/NE05E-SI NM interface Power supply interface PGND point GE optical interface (Console interface) Clock interface FE/GE optical interface Alarm interface Time interface E1 interface Electrical interface Antistatic jack interface Clock interface NM interface Power supply interface (Console interface) 10GE optical interface FE/GE optical interface Alarm interface FE/GE electrical interface...
  • Page 8 Introduction to the 2U-height Chassis NE08E-S6 Power supply interface Antistatic jack interface NM interface Clock interface (Console interface) Time interface Alarm interface GE optical interface PGND point E1 interface Electrical interface NE08E-S6E Power supply interface Antistatic jack interface NM interface Clock interface (Console interface) Time interface...
  • Page 9 Introduction to IMB (Indoor Mini Box) Overview of IMB 1. NO STEPPING sign 2. Protection plate 3. Slot assignment label 4. Cover plate Installation Clearance Requirements 1.Installation clearance requirements for the IMB right-side-mounted on the wall Recommended installation clearance Minimum installation clearance...
  • Page 10 Installation Clearance Requirements for the IMB 2.Installation clearance requirements for the IMB left-side-mounted on the wall Recommended installation clearance Minimum installation clearance 3.Installation clearance requirements for the IMB back-mounted on the wall Recommended installation clearance Minimum installation clearance...
  • Page 11 Introduction to AC/DC power system AC/DC power system (ETP4830-B1A2 power system) The ETP4830-B1A2 external power system converts input 220 V AC power to -53.5 V DC power and supplies power to the NE. NE08E-S6 ETP4830-B1A2 220 V AC power input interface Interfaces and air breakers on the front panel of the ETP4830-B1A2 Interface Name Number of Type...
  • Page 12 AC/DC power system (ETP4830-4815AF power system) When an NE device requires DC power but only the AC power module is available, use the ETP4830- 4815AF to convert the AC power to DC power. Fuse of battery Output terminals of load 1 Output terminals of load 2 Output terminals of...
  • Page 13 AC/DC power system (ETP4830-4815AF power system) •To ensure that the power supply of the equipment is not interrupted, you can also connect the device to batteries. Then, if the mains supply is interrupted, the device can be powered by batteries. •A storage battery array consists of four 12 V -40 Ah storage batteries.
  • Page 14 Installing the IMB on the Wall Installing the IMB on the Wall (Side-Mounted) NOTE The IMB can be installed with the right side or left side mounting on the wall. The installation methods are the same. Mounting the right side of the IMB on a wall is used as an example. Installing mounting ears Removing the protection plate (1) Insulation washer...
  • Page 15 Installing the IMB on the Wall (Back-Mounted) Installing mounting ears Removing the protection plate (1) Insulation washer (2) Installation positions for bolts (1) Protection plate Drill holes at the anchor points, and Marking anchor points install expansion bolt assemblies •Use a level to check that the two anchor holes on the marking template are on a horizontal plane, place the marking template Before mounting the IMB on a wall, ensure that the wall can against the wall, and then use a marker to mark anchor points.
  • Page 16 Installing Devices in the IMB Installing the NE Chassis NOTE •Make sure that the fan unit of the NE equipment is on the top of the NE equipment. •Install the device of the 2 U height on the right of the network cabinet and the device of the 1 U height on the right or in the middle of the network cabinet.
  • Page 17: Connecting And Routing Cables

    Connecting and Routing Cables Common Cables for the Chassis AC power cable DC power cable PGND cable Fiber Shielded network cable E1 cable (120-ohm ) E1 cable (75-ohm) Insert power cables into the DC connector 1U-height DC chassis 2U-height chassis 1U-height chassis (NE05E-SQ) use a screw to fix the OT...
  • Page 18 Cable connections in the external AC/DC power supply scenario NOTE •Before installing cables, use a marker to mark the two ends so that the two ends of one cable can easily match each other. •You must prepare cables according to actual cable routes during the installation. •A connector has been made at one end for a 10 m long ground cable before shipment.
  • Page 19 Cable connections in the embedded AC/DC power supply scenario NOTE A 2 U device(NE08E-S6) is capable of housing an AC/DC power module. Cable Installation Process 1. Install ground cable for the IMB network cabinet. Then install ground cable for the NE equipment. 2.
  • Page 20 Installation Checklist Item The position for each piece of equipment conforms to the engineering design and meets the space requirement. Sufficient space is reserved for equipment maintenance. The holes for the frame are in proper contact with the holes for the expansion bolt, and the frame and the wall surface are in proper horizontal contact.
  • Page 21: Powering On The Equipment

    Powering On the Equipment Powering On the Equipment CAUTION Before the equipment is powered on, you must use the multimeter to test whether a short-circuit occurs between the positive and negative terminals of the PDU. For running an AC NE05E-SQ, you must turn on the switches of both AC power modules operating in 1+1 backup mode. Use the NE05E-SI as an example for an AC device: The board hardware is faulty Indicator State Description...
  • Page 22 Installing the Cover Plate for the IMB Installing the Cover Plate Fit the tabs on the cover plate into the slots in Tighten the M3×8 bolt on the bottom of the the IMB cover plate for the IMB...
  • Page 23 Appendixes HW-100-48AC14D-1 Power System The HW-100-48AC14D-1 power system supports AC power ranging from 90 V to 264 V, and outputs -48 V DC power for NE05E-S2/SE/SF/SG/SH in natural heat dissipation mode. Colour of cables Pole Black Bule Single channel of -48 V input power Two channels of -48 V input power To provide two channels of -48 V input power, remove the terminal of one channel and connect the channel to the available binding post in the terminal of the other channel.
  • Page 24 HUAWEI TECHNOLOGIES CO., LTD. Huawei Industrial Base Bantian Longgang Shenzhen 518129 People’s Republic of China www.huawei.com...