Wiring Method; Figure 8-1 Wiring Required For External Loopback Check - Hitachi J.NET User Manual

Option
Table of Contents

Advertisement

8. Test and Maintenance Diagnosis

8.2 Wiring method

■ Wiring required for external loopback check (No. 4)
Figure 8-1 shows the wiring required for external loopback check.
LQE540-E
J.NET
A
B
Connect the A terminal of N1 (NET1) to that of
N2 (NET2), then the B terminal of N1 (NET1) to
that of N2 (NET2). There is no need to connect
the SG and SHD terminals to each other.

Figure 8-1 Wiring required for external loopback check

8-2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lqe540-e510ve

Table of Contents