HUAWEI MU509 Series HSDPA LGA Module
Acceptance Inspection Guide
Figure 2-4 Arrangement of the modules (after the vacuum bag is removed)
2.2 Label Inspection
Figure 2-5 MU509-b label
Issue 01(2013-09-14)
Check that the arrangement of modules is consistent with that shown in F igure 2-4 .
Check that the number of modules is consistent with that labeled on the large carton.
After the vacuum bag is removed for inspection, repack the modules in a vacuum bag to
ensure the quality when the modules deliver to the customer.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Acceptance Inspection
8