Description Of Various Steps; Calling Up The Latest Fault (Service Function 6.A); Fresh Water Filter (Only Combi Boiler Zwb; Plate Type Heat Exchanger (Only Combi Boiler Zwb - Bosch Greenstar Series Installation And Service Instructions For Contractors

Residential gas condensing boiler
Table of Contents

Advertisement

Inspection and maintenance
15.1

Description of various steps

15.1.1 Calling up the latest fault (service function 6.A)

▶ Select service function 6A (page 60).
An overview of the faults can be found on page 74.
15.1.2 Fresh water filter (only combi boiler ZWB...-3A)
▶ Close cold water tap.
▶ Depressurize the cold water pipe.
▶ To access the filter remove the safety clip (step 1), pull out the pipe
(step 2), and remove the filter from the pipe (step 3).
▶ If necessary, clean with plastic brush under running water.
1
Fig. 83 Filter in fresh water pipe
15.1.3 Plate type heat exchanger
(only combi boiler ZWB...-3A)
If the DHW output on the combi boiler is significantly reduced:
▶ Check filter in the cold water pipe for contamination ( page 66).
▶ Depressurize the appliance.
▶ Remove plate type heat exchanger and replace
-or-
▶ Descale with descaling agent approved for stainless steel (Grade
316-1.4401).
To remove the plate type heat exchanger:
▶ Unplug electrical connections.
▶ Remove hose from safety relief valve.
Fig. 84 Unplugging electrical connections / removing hose from safety
relief valve
66
3
2
6 720 641 933-92.1o
0010032728-001
▶ Loosen/remove pipe connections.
Fig. 85 Removing pipe connections
▶ Remove the boiler pressure gauge from the Heatronic boiler control.
Fig. 86 Removing the boiler pressure gauge
▶ Loosen the quick releases (steps 1 and 2) and remove the hydraulic
assembly in its entirety (step 3).
2.
1.
Fig. 87 Removing the hydraulic assembly
▶ Remove the plate type heat exchanger.
0010032727-001
6 720 641 933-48.2O
1.
3.
0010032726-001
Greenstar – 6721822579 (2021/01)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents