1. Preparation

1.1.

Check the Power Plugs

Please check that all power plugs are connected to the back of server.
1.2.

Check the NICs

1.2.1. Production Network

Please check that all Network Interface Cards are connected as required. This means the
two dual port adapters mounted in slots number 8 and 9 should be connected. These 4
1GB ports are bonded by the OS driver. For your reference please see the numbers on top
of the PCI slot. The below image does not contain NICs in these slots.

1.2.2. Management Network

Please check that at least one of both management adapters (MGB1 Management and
MGB2 Management) is connected to the network. With this connection you can monitor
your hardware health.