System Commissioning; Verification Before Power-On - Huawei LUNA2000 User Manual

Hide thumbs Also See for LUNA2000:
Table of Contents

Advertisement

LUNA2000-(5-30)-S0
User Manual

6.1 Verification Before Power-On

Table 6-1 Check items and acceptance criteria
No.
1
2
3
4
5
6
7
8
Issue 01 (2020-10-20)
6

System Commissioning

Check Item
Battery installation
Cables routing
Cable tie
Grounding
Switch
Cable connection
Unused terminal and port
Installation environment
Copyright © Huawei Technologies Co., Ltd.
6 System Commissioning
Acceptance Criteria
The installation is correct and reliable.
Cables are routed properly as required
by the customer.
Cable ties are evenly distributed and no
burr exists.
The PE cable is connected correctly,
securely, and reliably.
The DC switch and all switches
connected to the battery are OFF.
The AC output power cable, DC input
power cable, battery cable, and signal
cable are connected correctly, securely,
and reliably.
Unused terminals and ports are locked
by watertight caps.
The installation space is proper, and
the installation environment is clean
and tidy.
64