ABB Powernet 6920U-102-500 Manual page 25

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 20
Start-up
The function of device 6920 U-102-500 is software-
dependent. For programming, connect a PC to the Powernet
EIB bus line by means of the ETS 2, from Version 1.1
onwards or Power-Project (min. Vers. 3.0)by means of the
interface EIB-RS 232.
Allocation of the Physical Address
• Switch on the supply voltage.
• Press the programming button (Fig. 1, Pos. 8) on built-in
device 6920 U-102-500. The red programming LED
(Fig. 1, Pos. 9) illuminates.
• The red LED extinguishes after the physical address has
been programmed.
• Note the number of the physical address on device, if
appropriate, using a non-smudge pen.
Selection/Parameterization of the Application
Please refer to the current Technical Manual for a description
of the available applications/versions and appurtenant para-
meters.
GB

Advertisement

Table of Contents
loading

This manual is also suitable for:

2cka006900a1666

Table of Contents