8 On-site adjustment steps (When BAC-HD150 is connected to PAC-YG50ECA)

8.1

On-site adjustment flowchart

When BAC-HD150 is connected to PAC-YG50ECA, on-site adjustment is divided into two steps as follows.
Before following the steps below, set the M-NET address, group, and interlocked operation with LOSSNAY for PAC-YG50ECA
by using AG-150A, and complete a test run for the air conditioning units.
By following these steps, the cause of trouble can be solved clearly and on-site adjustment can be identified efficiently.
It is recommended to follow the steps below.
Step - 1 Initial settings for the BAC-HD150 system and BACnet
Make the setting for the BAC-HD150 system and BACnet
Tool.
(Refer to the Instruction Book that came with Setting Tool for BAC-HD150 system setting
and setting related to BACnet
Step - 2 Test run of BAC-HD150
Check that operation status of conditioning units appears correctly on the BMS and that air
conditioning units operate properly from the BMS control.
®
.)
- 36 -
®