Dell EMC Edge 510 LTE Installation Manual page 12

Hide thumbs Also See for EMC Edge 510 LTE:
Table of Contents

Advertisement

NOTE:
The rubber feet must be removed because they share the same screw holes with the wall mount brackets.
2. Using a torque screwdriver, attach the included wall mount brackets to the platform using the four M3 screws that mounted
the rubber feet.
3. Anchor the screws into the wall surface.
4. Slide the cross-shaped cutouts of the wall. mount brackets into the screws that are anchored to the wall
12
Edge 510 LTE installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents