Platform Power-On; Platform Setup - Dell EMC Edge 510 LTE Installation Manual

Hide thumbs Also See for EMC Edge 510 LTE:
Table of Contents

Advertisement

2. Use the eight included M3 screws to attach the platforms to the dual rackmount tray.
Use four screws for each platform.
3. Install the rackmount tray in to your rack using the installation instructions included with the tray.

Platform power-on

Before you turn on the platform, reinspect the rack mounting or desktop placement of the platform. Verify that the power
supply to the Edge 510 LTE is secure.
Verify the following:
● The ambient temperature around the platform, which may be higher than the room temperature, is within the limits that are
specified for the Edge 510 LTE. For more information, see Specifications.
● There is no source of heat near the unit.
NOTE:
If components are mishandled, ESD damage can occur. Always wear an ESD-preventive wrist or heel ground strap
when handling the platform and components.

Platform setup

WARNING:
To avoid electrostatic discharge (ESD) damage, wear grounding wrist straps when handling this
equipment.
Install the device in an area that meets the following safety requirements:
14
Edge 510 LTE installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents