Edge 510 Lte Configuration; Prerequisites - Dell EMC Edge 510 LTE Installation Manual

Hide thumbs Also See for EMC Edge 510 LTE:
Table of Contents

Advertisement

As the system functions are in process, the service indicator displays:
● White—initial power-on and boot is in progress.
● Flashing blue—system reset or software update is in progress.
● Flashing white—VMware SD-WAN Orchestrator function in progress.
The Edge 510 LTE also includes RJ45 port status LED displays on the back of the platform.
The RJ45 port status LEDs are located to the left and right of each port.
Table 1. RJ45 port status indicator LEDs
LEDs
Status
Left side-activity
Solid green
(green)
Blinking green
Right side-link status
Solid green
(bicolor green or
Solid amber
amber)
Off

Edge 510 LTE configuration

● Two-core CPU
● Four 1 GbE networking ports
● One Mini USB 2.0 console port
● Two USB 2.0 Type-A
● AC power supply
● No fan
● Airflow on sides and back

Prerequisites

The following is a list of components that are required for successful platform installation:
NOTE:
For detailed installation instructions, see
● Dell EMC Edge 510 LTE platform
● AC country- and regional-specific cable to connect the AC power source to each of the AC power supplies
● Wall mount brackets and accessories for mounting on wall.
● Rubber feet for desktop use
● (Optional) rail mounting accessories for rack mount
● (Optional) screws for rack installation (not included)
● Number 1 and number 2 Phillips screw drivers (not included).
● Torx screwdriver (not included)
● RJ-45 Ethernet cable
● Mini-USB console cable (not included).
Link and speed
No activity
Activity
Link up, 1 Gbps
Link up, 10 Mbps or 100 Mbps
Link down
Site preparations
and
Site
installation.
Dell EMC Edge 510 LTE
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents