PHASE 2 - TRANSMITTER INSTALLATION
Pressure or absolute pressure measurement of a
condensable vapor in a pipe
filling
1. Place the tap at the side of the line.
tee
2. Mount the transmitter below the tap.
gate
3. Connect the + (H) side of the transmitter to the pipe.
valve
4. Fill the vertical section of the connecting line to the tap with
a compatible liquid through the dedicated filling tee.
vent
valve
Pressure or absolute pressure measurement of a gas in a
pipe
1. Place the tap at the top or side of the line.
2. Mount the transmitter beside or above the tap.
3. Connect the + (H) side of the transmitter to the pipe.
gate
valve
- 11 -