Download Print this page

Epson EpiqVision Ultra LS500 Installation Manual page 8

Laser projection tv
Hide thumbs Also See for EpiqVision Ultra LS500:

Advertisement

5.
Insert four of the supplied M5 × 8 mm screws in each corner.
Note: Make sure there are no gaps between the frame pieces before you tighten the screws all the way.
Testing the Frame Position
1.
Remove the jig from the front of the projector.
2.
Remove the frame from the sheet.
3.
Hang the frame on the wall brackets, with the screws facing the wall.
4.
Move the frame left or right as needed to align it with the projected image, and make sure the arrow heads in the projected
image extend to the outer edges of the frame.
Note: If the image is not aligned, slightly adjust the position of the projector as needed.
Attaching the Screen Material
1.
Remove the screen material from the tube and unroll it on the transparent sheet. The back of the screen should be facing you.
Caution: Do not lift the screen until after you have attached the frame.
Note: The back of the screen has a
2.
Center the frame on top of the screen material, with the screw holes facing up.
8
Assembling the Screen
DOWNSIDE
label attached. Make sure the side of the screen with the label is closest to the wall.
DOWNSIDE

Advertisement

loading