6
Installing the Cab
Parts needed for this procedure:
1
Cab frame
1
Back foam seal
1
Back foam seal carpet
4
Flange-head bolt (5/16 x 1-1/4 inches)
4
Flange nut (5/16 inch)
4
Flat washer (5/16 inch)
2
Support plate
1
Right, front foam seal
1
Left, front foam seal
1
Upper, rear foam seal
2
Foam seal
6
Hex-head bolt (3/8 x 1-1/4 inches)
6
Flange nut (3/8 inch)
6
Washer (3/8 inch)
Procedure
1.
Remove the backing from the back foam seal
and attach the seal to the machine as shown
in
Figure
8.
Important:
Ensure that the underside of the
back foam seal with the adhesive faces the
top of the rail surface.
1. Back foam seal
2.
Remove the seat base.
Figure 8
3.
Remove the 3 screws and 3 nuts securing the
left handhold, and remove it
1. Handhold
4.
Install the front sealing foam if it is not already
installed
Note:
Ensure that you install the front sealing
foam onto the cab before you install the cab
onto the machine.
1. Front sealing foam
g035251
9
(Figure
Figure 9
(Figure
10).
Figure 10
9).
g037177
g038337