4
Heater Unit Installation
4.1
Select a suitable position in the bathroom.
4.2
Remove the screw (A) at the bottom of the unit. (Fig. 2)
4.3
Remove the Front Cover from the bottom and then lift up the front cover.
4.4
mark 3 screw points of the Heater Base on the wall. The eater position should be 1.5m above
the bathroom floor.
HEATER UNIT INSTALLATION DIAGRAM
Rubber
Washer
Screw
A
*Optional For AC/DC Pump Model
7 / EN