EcoView™ 8 DO Module Installation and Commissioning
This document covers the installation and
commissioning of the EcoView™ 8 DO Module.
See the following documents for installation of other
EcoView system components:
EcoView Touchscreen Installation and System
Start-up
(129-562)
EcoView Thermostat Installation Instructions
(129-564 or 129-566)
EcoView Multi-phase Meter Installation
Instructions
(129-563)
Product Description
The EcoView 8 DO Module is an eight-channel, pilot-
duty controller module that is used to manage lighting
or other energy-consuming electrical loads that would
benefit from scheduling. Relay channels may be
accessed through the EcoView Touchscreen or
remotely through the EcoView Web application.
Product Number
57-002
EcoView I/O Module, 8 DO, with Zigbee,
includes power supply
Caution Notations
CAUTION:
Equipment damage or loss of
data may occur if you do not
follow the procedures as
specified.
Required Tools and Materials
Flat-blade screwdriver (1/8-inch blade width)
Wire strippers
Expected Installation Time
15 minutes for installing the EcoView 8 DO Module
30 minutes for wiring each DO
Item Number 129-565, Rev. CA
Installation Instructions
Prerequisites
NOTE: If the EcoView 8 DO Module will be directly
controlling line voltage, it must be mounted in
an appropriate plastic NEMA enclosure.
The EcoView Touchscreen is installed and started up
Installation Instructions
according to the
A 120 Vac outlet is available for the EcoView 8
DO Module power supply.
Depending on the type of installation, other
prerequisites may have to be completed.
Installation
CAUTION:
Always wear an electro-static discharge
(ESD) wrist strap and discharge
accumulated static before touching field
panel components.
 Install the EcoView 8 DO Module near the loads
to be controlled.
1. If the EcoView 8 DO Module will be directly
controlling line voltage, mount the plastic NEMA
enclosure in the desired location.
2. If necessary, install a standard 120 Vac outlet in
the enclosure where the EcoView 8 DO Module
power supply will be attached.
3. Using the provided screws, mount the EcoView 8
DO Module assembly in the enclosure.
4. Attach the EcoView 8 DO Module 24 Vac power
supply to the standard 120 Vac outlet and secure
with the provided plate screw.
5. Wire the individual circuits to be controlled to the
2-pin connectors for Relay 1 – Relay 8.
NOTE: The relays are capable of controlling loads up
to 240 Vac at 3A. Anything outside of this
range should be controlled by contactors.
Document No. 129-565
April 28, 2015
(129-562).
Page 1 of 5

Advertisement

loading

Summary of Contents for Siemens EcoView 8 DO

  • Page 1 Prerequisites commissioning of the EcoView™ 8 DO Module. See the following documents for installation of other NOTE: If the EcoView 8 DO Module will be directly EcoView system components: controlling line voltage, it must be mounted in an appropriate plastic NEMA enclosure.
  • Page 2 Commissioning the 8 DO Module from the list, and then press the Next button. In order to commission the EcoView 8 DO Module to the ZigBee network, the DO module needs to be reset. 1. Press the recessed Reset button four times in rapid succession (see Figure 1).
  • Page 3: Troubleshooting

    ⇨ The EcoView 8 DO Module is assigned to the 7. Select the appropriate Zigbee MAC Address for 8. Press the Accept button. the 8 DO Module from the list, and then press the Finish button. EcoView Touchscreen and locked into the wireless network.
  • Page 4: Fcc Note

    » 9. Press the Accept button. Per RSS-Gen Issue 3 (December 2010 Section 7.1.3) 10. Return to the EcoView 8 DO Module and install it on the correct EcoView Touchscreen network. FCC Note This device complies with Part 15 of the FCC rules.
  • Page 5 Information in this publication is based on current specifications. The company reserves the right to make changes in specifications and models as design improvements are introduced. EcoView is a trademark of Siemens Industry, Inc. Other product or company names mentioned herein may be the trademarks of their respective owners. © 2015 Siemens Industry, Inc.