EcoView™ 8 DO Module Installation and Commissioning
This document covers the installation and
commissioning of the EcoView™ 8 DO Module.
See the following documents for installation of other
EcoView system components:
EcoView Touchscreen Installation and System
Start-up
(129-562)
EcoView Thermostat Installation Instructions
(129-564 or 129-566)
EcoView Multi-phase Meter Installation
Instructions
(129-563)
Product Description
The EcoView 8 DO Module is an eight-channel, pilot-
duty controller module that is used to manage lighting
or other energy-consuming electrical loads that would
benefit from scheduling. Relay channels may be
accessed through the EcoView Touchscreen or
remotely through the EcoView Web application.
Product Number
57-002
EcoView I/O Module, 8 DO, with Zigbee,
includes power supply
Caution Notations
CAUTION:
Equipment damage or loss of
data may occur if you do not
follow the procedures as
specified.
Required Tools and Materials
Flat-blade screwdriver (1/8-inch blade width)
Wire strippers
Expected Installation Time
15 minutes for installing the EcoView 8 DO Module
30 minutes for wiring each DO
Item Number 129-565, Rev. CA
Installation Instructions
Prerequisites
NOTE: If the EcoView 8 DO Module will be directly
controlling line voltage, it must be mounted in
an appropriate plastic NEMA enclosure.
The EcoView Touchscreen is installed and started up
Installation Instructions
according to the
A 120 Vac outlet is available for the EcoView 8
DO Module power supply.
Depending on the type of installation, other
prerequisites may have to be completed.
Installation
CAUTION:
Always wear an electro-static discharge
(ESD) wrist strap and discharge
accumulated static before touching field
panel components.
Install the EcoView 8 DO Module near the loads
to be controlled.
1. If the EcoView 8 DO Module will be directly
controlling line voltage, mount the plastic NEMA
enclosure in the desired location.
2. If necessary, install a standard 120 Vac outlet in
the enclosure where the EcoView 8 DO Module
power supply will be attached.
3. Using the provided screws, mount the EcoView 8
DO Module assembly in the enclosure.
4. Attach the EcoView 8 DO Module 24 Vac power
supply to the standard 120 Vac outlet and secure
with the provided plate screw.
5. Wire the individual circuits to be controlled to the
2-pin connectors for Relay 1 – Relay 8.
NOTE: The relays are capable of controlling loads up
to 240 Vac at 3A. Anything outside of this
range should be controlled by contactors.
Document No. 129-565
April 28, 2015
(129-562).
Page 1 of 5