Haier 1U71SABFRA Service Manual page 72

Table of Contents

Advertisement

4
Connecting the indoor/outdoor Electric Cable
Removing the wiring cover
Remove terminal cover at right bottom corner of
indoor unit, then take off wiring cover by removing
its screws.
When connecting the cable after installing the indoor unit
1. Insert from outside the room cable into left side of the wall
hole, in which the pipe has already existed.
2. Pull out the cable on the front side, and connect the cable
making a loop.
When connecting the cable before installing the indoor unit
Insert the cable from the back side of the unit, then pull it out on the front side.
Loosen the screws and insert the cable ends fully into terminal block, then
tighten the screws.
Pull the cable slightly to make sure the cables have been properly inserted and
tightened.
After the cable connection, never fail to fasten the connected cable with the
wiring cover.
-mod 09-24:
Indoor unit
Note:
When connecting the cable, con rm the terminal number of indoor and
o
utdoor units carefully. If wiring is not correct, proper operation can not
be carried out and will cause defect.
Connecting wiring
1. If the supply cord is damaged, it must be replaced by the manufacturer or its
service agent or a similar quali ed person. The type of connecting wire is
H05RN-F or H07RN-F.
2. If the fuse on PC board is broken please change it with the type of
T. 3.15A/250V.
3. The wiring method should be in line with the local wiring standard.
4. After installation, the power plug should be easily reached.
5. A breaker should be incorporated into xed wiring. The breaker should be
all-pole switch and the distance between its two contacts should be not less
than 3mm.
6.Please consult your reseller and/or installer to determine if you have a DRED
appliance. Connect output from your home's electricity power meter (where
available) to the RJ45 connector on the outdoor unit, as shown.
(This function is unavailable on some models.)
Power cable:
3G2.5mm
2
4G1.5mm
{
POWER
Outdoor unit
2
4G1.0mm
Outdoor unit
Installation of Outdoor Unit
1
Drawing for the installation of indoor and outdoor units
Install according to
Connection of pipes
2
To bend a pipe, give the roundness as large as possible not to crush the pipe ,
and the bending radius should be 30 to 40 mm or longer.
Connecting the pipe of gas side rst makes working easier.
The connection pipe is specialized for R410A.
Half union
Flare nut
Spanner
Torque wrench
Be careful that matters, such as wastes of sands, etc. shall not enter the pipe.
The standard pipe length is 5m. If it is over 7m, the function of the unit will be
affected. If the pipe has to be lengthened, the refrigerant should be charged,
according to 20 g/m. But the charge of refrigerant must be conducted by profes-
sional air conditioner engineer. Before adding additional refrigerant, perform air
purging from the refrigerant pipes and indoor unit using a vacuum pump,then
charge additional refrigerant.
CAUTION
B
Indoor unit
A
Outdoor unit
Outdoor unit
Oil trap
B
Indoor unit
A
3
Connection
Use the same method on indoor unit. Loosen the screws on terminal block and
insert the plugs fully into terminal block, then tighten the screws.
Insert the cable according to terminal number in the same manner as the indoor
unit.
If wiring is not correct, proper operation can not be carried out and controller
may be damaged.
Fix the cable with a clamp.
Attaching Drain-Elbow
4
If the drain-elbow is used,
please attach it as gure. (Note:
Only for heat pump unit.)
Purging Method:To use vacuum pump
5
1.
Detach the service port's cap of
and 3-way's, connect the service port into the projection of charge hose (Iow)
for gaugemanifold. Then connect the projection of charge hose (center) for gau-
gemanifold into vacuum pump.
2.
gaugemanifold, operate vacuum pump. If the scale-
Open the handle at Iow in
moves of gause (Iow) reach vacuum condition in a moment, check 1. again.
3.
Vacuumize for over 15min.And check the level gauge which should read -0.1MPa
(76 cm Hg) at Iow pressure side. After the completion of vacuumizing, close the
handle 'Lo' in gaugemanifold and stop the operation of the vacuum pump. Check
condition of the scale and hold it for 1-2min. If the scale-moves back in spite of
tightening, make aring work again, the return to the beginning of 3 .
4.
Open the valve rod for the 2-way valve to an angle of
After 6 seconds, close the 2-way valve and make the inspection of gas leakage.
Forced fastening without careful centering may
damage the threads and cause a leakage of gas.
Pipe Diameter( )
Fastening torque
Liquid side6.35mm(1/4")
Liquid/Gas side9.52mm(3/8")
Gas side 12.7mm(1/2")
Gas side 15.88mm(5/8")
Outdoor unit
B
Indoor unit
A
Max.Elevation:
05-13K:Amax=10m
18-24K:Amax=15m
In case the elevation A is more
than 5m, oil trap shoud be
installed every 5~7m
Max. Length:
05-13K:Bmax=15m
18-24K:Bmax=25m
In case the pipe length B is
more than 7m, the refrigerant
should be charged, according
to 20 g/m for 05-13K and 50g/m for
18-24K.
3-way valve, the valve rod's cap for 2-way valve
anticlockwise 90 degrees.
18N.m
42 N.m
55N.m
60 N.m
3

Advertisement

Table of Contents
loading

Table of Contents