Huawei SUN2000-50KTL-JPM1 Quick Manual

Huawei SUN2000-50KTL-JPM1 Quick Manual

Hide thumbs Also See for SUN2000-50KTL-JPM1:

Advertisement

Quick Links

SUN2000-(50KTL-JPM0, 50KTL-JPM1, 63KTL-JPM0)
Quick Guide
Issue: 05
Part Number: 31500ADX
Date: 2021-09-14
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei SUN2000-50KTL-JPM1

  • Page 1 SUN2000-(50KTL-JPM0, 50KTL-JPM1, 63KTL-JPM0) Quick Guide Issue: 05 Part Number: 31500ADX Date: 2021-09-14 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2: Product Overview

    Use insulated tools when installing the device. For personal safety, wear proper personal protective equipment (PPE). • Huawei shall not be liable for any consequence caused by violation of the storage, moving, installation, and operation regulations specified in this document and the user manual. Product Overview...
  • Page 3 Indicator Status Description Alarm/Mainte Blinking red at long intervals (on A warning alarm is nance for 1s and then off for 4s) generated. indicator Blinking red at short intervals (on A minor alarm is Alarm status for 0.5s and then off for 0.5s) generated.
  • Page 4: Installation Requirements

    Installation Requirements Installation Angle Installation Space For ease of installing the SUN2000 on the mounting bracket, connecting cables to the bottom of the SUN2000, and maintaining the SUN2000 in future, it is recommended that the bottom clearance be between 300 mm and 730 mm.
  • Page 5 You are advised to apply anti-rust paint on the hole positions for protection.
  • Page 6: Installing Cables

    Installing Cables Installation Preparations • Before installing cables, ensure that all required OT terminals and cables are prepared. • The following table lists only recommended cable specifications. For more cable specifications, see the user manual. Model/ Name Description Specifications If you connect the ground cable to 16 mm outdoor copper Ground cable...
  • Page 7: Opening The Maintenance Compartment Door

    Installing the Ground Cable • The ground point on the enclosure is preferred to connect to the PE cable for the SUN2000. • The ground point in the maintenance compartment is mainly used for connecting to the ground cable included in the multi-core AC power cable. For details, see section " 4.4 Installing AC Output Power Cables."...
  • Page 8: Installing Ac Output Power Cables

    If the screws on the enclosure door are lost, obtain spare screws from the fitting bag bound to the inductor cover at the bottom of the enclosure. Position for saving spare screws 3. Remove the cover and hang it on the hook of the enclosure door. Installing AC Output Power Cables 1.
  • Page 9 3. Remove an appropriate length of the jacket and insulation layer from the AC output power cable using a wire stripper. (Ensure that the jacket is in the maintenance compartment.) a. Three-core cable (excluding the ground b. Four-core cable (including the ground cable) cable) Core...
  • Page 10: Installing Dc Input Power Cables

    a. Three-core cable (excluding the ground b. Four-core cable (including the ground cable) cable) 6. Tighten the thread-lock sealing nut. 7. Clear debris from the maintenance compartment. Installing DC Input Power Cables Selecting DC Input Terminals The SUN2000 provides two DC switches, named as DC SWITCH 1 and DC SWITCH 2. DC SWITCH 1 controls the 1st to 6th sets of DC input terminals, whereas DC SWITCH 2 controls the 7th to 12th sets of DC input terminals.
  • Page 11 1. Use the Amphenol Helios H4 PV connectors provided with the SUN2000. If the terminals are lost or damaged, purchase the PV connectors of the same model. The device damaged caused by incompatible PV connectors is not covered under any warranty or service agreement.
  • Page 12: Installing The Rs485 Communications Cable

    Installing the RS485 Communications Cable • When routing communications cables, separate communications cables from power cables to prevent communication from being affected. • An RS485 cable can connect to either a terminal block or an RJ45 network port. It is recommended that the RS485 cable connect to a terminal block.
  • Page 13 4. Install the terminal base on the terminal 5. Bind the communications cable. block, and connect the shield layer to the ground point. • When connecting the shielded cable, choose whether to crimp the OT terminal based on site requirements. •...
  • Page 14: Verifying The Installation

    4. Bind the communications cable. 3. Insert the RJ45 connector into the RJ45 network port in the SUN2000 maintenance compartment. Tie the communication cables with the cables on internal side of the maintenance compartment. 5. Tighten the thread-lock sealing nut and seal the cable gland. Verifying the Installation Yes □...
  • Page 15: Powering On The System

    As a convenient local monitoring and maintenance platform, it supports alarm query, parameter configuration, and routine maintenance. The app name is SUN2000. 2. Log in to Huawei AppGallery (https://appstore.huawei.com), search for SUN2000, and download the app installation package. You can also scan the QR code (https://appgallery.cloud.huawei.com/appdl/C10279542) to download the installation package.
  • Page 16: Grid Codes

    Function Menu • The screenshots in this document correspond to app version 3.2.00.013 (Android). • When the WLAN connection is used, the initial name of the WLAN Adapter-WLAN module SN hotspot is , and the initial password is Changeme. • The initial password for Common User, Advanced User, and Special User is 00000a.