Figure 34. Securing the server
1
Rack release latches
Remove the server from the rack
Figure 35. Removing SR250
① Disconnect all the cables that are connected to the server, and slide the server out until it stops.
② Press the release latches to disengage the inner rails.
③ Remove the server.
Install the rail kit and SR670
A A b b o o u u t t t t h h i i s s t t a a s s k k
30
ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide
2
Front screw