Replacement Of Drying Heater; Replacement Of Water Level Sensor - Panasonic NA-D106X1 Service Manual

Table of Contents

Advertisement

NA-D106X1
8.6.2.

Replacement of Drying heater

1. Remove the 6 Heater cover B fixing screws and the 2
Clamping bands, then remove Heater cover B.
2. Slide the Heater packing A forward along the groove to
draw out, and replace it.
*Once the Heater cover B is removed, the Drying heater
is exposed.
8.7.
3D sensor, Water level sensor,
Nozzle and Detergent case A
8.7.1.

Replacement of Water level sensor

1. After performing the procedures for Replacement of
Panel A, Dry filter, Filter frame and Top board (8.1),
remove the 1 Clamping band fixing the lead wire and 1
connector from Water level sensor, and then remove the
Air tube from the Water level sensor.
34

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents