Huawei RRU3203-B12 Installation Manual page 83

Table of Contents

Advertisement

RRU3203
Installation Guide
l
Issue 06 (2012-04-16)
2.
Connect the other end of the cable to the standard AISG male connector on the RCU.
3.
Lay out the cable by referring to
using cable ties.
4.
Label the installed cable by referring to Attaching an L-Shaped Label.
Install an AISG multi-wire cable that is configured with an AISG extension cable.
1.
Link the waterproofed DB9 connector at one end of the AISG multi-wire cable to the
RET port on the RRU bottom, and link the other end to the standard AISG male
connector of the AISG extension cable, as shown in
Figure 8-12 Installing an RRU AISG multi-wire cable
2.
Connect the other end of the AISG extension cable to the standard AISG male
connector on the RCU, as shown in
Figure 8-13 Installing an RRU AISG extension cable
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8.1 Cabling
Requirements, and then bind the cable
Figure
Figure
8-13.
8 Installing RRU Cables
8-12.
75