Download Print this page
Huawei UPS5000-H Series Quick Manual

Huawei UPS5000-H Series Quick Manual

100 kva power modules, three-phase three-wire
Hide thumbs Also See for UPS5000-H Series:

Advertisement

Quick Links

UPS5000-H-(1200 kVA-1600 kVA) Quick Guide (100 kVA Power Modules, Three-Phase Three-Wire)
01
Installation Preparations
1. Before installation, read the user manual carefully to get familiar with product information and safety precautions.
2. Use insulated tools when installing the equipment.
3. Only engineers certified by Huawei or its agent are allowed to install, commission, and maintain the UPS. Otherwise,
personal injury or equipment damage may occur, and the resulting UPS faults are beyond the warranty scope of Huawei.
4. This document describes the installation procedure for a single UPS. For details about how to install a parallel system,
contact Huawei technical support.
Model
Weight
UPS5000-H-1200K-NTN
< 1600 kg
UPS5000-H-1600K-NTN
< 2300 kg
Inductor cabinet
< 1100 kg
Clearances and Cabinet Description (1200 kVA)
Cabinet Description
SPDs and
SPD switches
Power modules
Dimensions (H x W x D)
2200 mm x 1600 mm x 1000 mm
2200 mm x 2400 mm x 1000 mm
2000 mm x 600 mm x 1000 mm
Installation
Clearances
UPS cabinet
Rectifiers
Surge protection boxes
Control module
Main switch QF of the inductor cabinet
Bypass fan power supply unit (PSU)
Intelligent detection card
Bypass modules
Fan power switch QS1-4
Bypass control module
Fans
Item
Mains input
Mains input current (A)
Bypass input
Bypass input current (A)
Output
Output current (A)
Nominal battery discharge current (A)
Battery input (lead-acid
Maximum battery discharge current (A)
battery)
Recommended cross-sectional area
(mm
2
)
Nominal battery discharge current (A)
Maximum battery discharge current (A)
Battery input (SmartLi)
Recommended cross-sectional area (mm
Equipotential ground point Recommended cross-sectional area (mm
Clearances and Cabinet Description (1600 kVA)
Inductor
cabinet
Cabinet Description
SPDs and
SPD switches
Power modules
1
Issue: 01
Date: 2021-10-13
1200 kVA
1600 kVA
Remarks
2229
2972
Connection method: Crimped DT terminal
1823
2431
Bolt specifications:
1823
2431
L1/L2/L3/U/V/W/PE: M12 x 45 mm (47 N· m)
2660
3546
Battery +/-/PE: M16 x 55 mm (120 N· m)
3185
4247
Equipotential ground point: M6 x 20 mm (4.5 N· m)
+/-
6 x (2 x 240)
8 x (2 x 240)
NOTE:
PE
2 x 240
The currents listed in the table are measured at a rated voltage
2493
3324
of 380 V.
3192
4172
If the top cabling component and bottom cabling cabinet are
For details, see the IEC-60364-5-52
not configured, copper bars need to be prepared for the mains
2
)
specifications and
SmartLi User Manual
.
input, bypass input, and output, which cannot be directly
connected using cables. (Huawei does not provide copper bars
or connector boxes.) If they are configured, refer to the
2
) 16
recommended cable specifications in the user manual.
The battery input can be connected only using cables.
Installation
Clearances
Power
cabinet 1
Inductor
Power
cabinet
cabinet 2
Bypass
cabinet
Rectifiers
Surge protection boxes
Main switch QF of the
inductor cabinet
Control module
Intelligent detection card
Bypass fan PSU
Fan power switch QS1-4
Bypass modules
Bypass control module
Fans

Advertisement

loading

Summary of Contents for Huawei UPS5000-H Series

  • Page 1 Output current (A) 1823 2431 L1/L2/L3/U/V/W/PE: M12 x 45 mm (47 N· m) 3. Only engineers certified by Huawei or its agent are allowed to install, commission, and maintain the UPS. Otherwise, Nominal battery discharge current (A) 2660 3546 Battery +/-/PE: M16 x 55 mm (120 N· m) personal injury or equipment damage may occur, and the resulting UPS faults are beyond the warranty scope of Huawei.
  • Page 2 UPS5000-H-(1200 kVA-1600 kVA) Quick Guide (100 kVA Power Modules, Three-Phase Three-Wire) Copper Bar Location (1200 kVA) Copper Bar Location (1600 kVA) Top View of the Distance Between Copper Bars on the Top (unit: mm) Top view of the Distance Between Copper Bars on the Top (unit: mm) Recommended space for connector boxes (If one power source is Recommended space for connector boxes (If one power source is used, a connector box must be deployed for the copper bars that...
  • Page 3: Installing Cabinets

    UPS5000-H-(1200 kVA-1600 kVA) Quick Guide (100 kVA Power Modules, Three-Phase Three-Wire) Installing Cabinets Unpacking 1600 kVA power cabinet 2 + bypass cabinet/ 1600 kVA power cabinet 1 Inductor cabinet 1200 kVA cabinet Securing Cabinets Securing the Cabinets (1200 kVA) UPS cabinet Inductor cabinet M12 bolt Spring washer...
  • Page 4 UPS5000-H-(1200 kVA-1600 kVA) Quick Guide (100 kVA Power Modules, Three-Phase Three-Wire) Securing the Cabinets (1600 kVA) Before combining cabinets, remove Inductor cabinet Power cabinet 1 Power cabinet 2 Bypass cabinet the screws preinstalled on the copper bars in power cabinet 2. Store them properly for future use.
  • Page 5 UPS5000-H-(1200 kVA-1600 kVA) Quick Guide (100 kVA Power Modules, Three-Phase Three-Wire) Installing Power Cables Between the UPS and the Inductor Cabinet Installing Power Cables between the UPS and the Inductor Cabinet (1200 kVA) Side view of the UPS Copper bars are heavy. Two persons are required. Power cable hole Signal cable hole Signal cable hole...
  • Page 6 UPS5000-H-(1200 kVA-1600 kVA) Quick Guide (100 kVA Power Modules, Three-Phase Three-Wire) Installing Copper Bars and Signal Cables inside the UPS Cabinet Installing Power Cables between the UPS and the Inductor Cabinet (1600 kVA) Side view of the UPS Remove parallel copper bars. Copper bars are heavy.
  • Page 7 UPS5000-H-(1200 kVA-1600 kVA) Quick Guide (100 kVA Power Modules, Three-Phase Three-Wire) Installing Input and Output Cables Equipotential Installing Cables (1200 kVA) Installing Cables (1600 kVA) ground point Mains input Bypass input Battery input Battery input UPS output Equipotential ground point Signal Signal cable route...
  • Page 8: Power-On Commissioning

    LCD and admin (system administrator) 000001 Changeme WebUI passwords after operator (common user) 000001 Changeme the first login. You can also log in to Huawei technical support website: https://support.huawei.com/enterprise https://support.huawei.com Copyright © Huawei Technologies Co., Ltd. 2021. All rights reserved.

This manual is also suitable for:

Ups5000-h-1200k-ntnUps5000-h-1600k-ntn