Connecting the power supply module

The wiring from the cubicle terminal block to the IED terminals (see Figure
diagram) must be made in accordance with the established guidelines for this type of equipment.
The auxiliary power wiring should have a minimum cross-sectional area of 1.0 mm
rating of 250 V. Branch circuit protection must be provided in the auxiliary power supply wiring to the
IED, and if necessary it must be possible to disconnect manually from the power supply. Fuse or
circuit breaker up to 6 A and 250 V should be close to the equipment. It is recommended to separate
the instrument transformer leads from the other cables, that is, they should not be run in the same
cable ducts or loom. The connections are made on connector X11.
26
X402
IEC1700057-1-en.vsdx
Rear view of IED showing the earthing point
Description
Protective conductor terminal. For connection of the external protective
(earth) conductor.
Use the protective conductor terminal (1) for connection to the stations
earthing system.
Insert only the corresponding male connector to the female connector. Inserting
anything else (such as a measurement probe) may violate the female connector and
prevent a proper electrical contact between the printed circuit board and the external
wiring connected to the screw terminal block.
© 2017 - 2021 Hitachi Power Grids. All rights reserved
X402
IEC17000056-1-en.vsdx
Switchgear control unit SAM600-IO
1MRK 514 030-UEN Rev. C
SEMOD128790-5 v7
8
for PSM connection
2
and a voltage
Installation manual

Advertisement

Table of Contents
loading

Table of Contents