Commissioning The Bts3900 Services - Huawei BTS3900 GSM Commissioning Manual

Hide thumbs Also See for BTS3900 GSM:
Table of Contents

Advertisement

BTS3900 GSM
Commissioning Guide
9
About This Chapter
This describes how to test whether the BTS3900 supports CS services and PS services by using
an MS.
Prerequisite
The BTS3900 is running normally.
9.1 Performing the Loopback Test of a Channel
This describes how to perform the loopback test of a channel. Before testing the CS and PS
services, you must check whether the transmission links of the signaling channel and traffic
channel are normal. The loopback test of a channel consists of the loopback test of a signaling
channel and the loopback test of a traffic channel.
9.2 Testing CS Services
This describes how to test CS services by making test calls between MSs or between an MS and
a PSTN user.
9.3 Testing PS Services
This describes how to test PS services by browsing websites and downloading files through an
MS. You need to test only the BTS that is configured with the GPRS or EGPRS services.
Issue 03 (2008-07-15)

Commissioning the BTS3900 Services

Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
9 Commissioning the BTS3900 Services
9-1