Test Operation - Panasonic CZ-64ESMC3 Installation Instructions Manual

System controller
Hide thumbs Also See for CZ-64ESMC3:
Table of Contents

Advertisement

Test Operation

Test operation for the system controller
(Preparation) Referring to the operating instructions for indoor units and outdoor units,
perform the test operation beforehand.
Turn on the system controller
(Assigning blinks, and the indoor unit connection group is automatically checked.)
Confi rm that the number of connected indoor units (Only main units when controlling in group)
is the same as the number of groups displayed on the system controller
* If not the same, see central address setting (P.25), and make the setting.
* When connecting the interface adaptor, set the central address.
Indoor unit test operation
Test operation ON/OFF procedure
1
Press and hold the 3 buttons for
4 seconds or more simultaneously.
,
,
2
Select the item to set.
All/Zone
3
Select the operation target.
4
(Press
to finish.)
Displays the
selected
setting
target
21
(EN)

Advertisement

Table of Contents
loading

Table of Contents