Download Print this page

Toro 137-5226 Installation Instructions page 4

Mud pump transducer relocation kit directional drill

Advertisement

8. Torque the transducer adapter to 79 to 98 N∙m (58 to 72 ft-lb) and the transducer to 46 to 57 N∙m (34
to 42 ft-lb).
9. Route the harness along the existing harnesses over to the transducer
Important:
Do not route the wire harness near moving parts.
10. Secure the harness using the cable ties
Figure 6
(Figure
7).
Figure 7
Overview of the wire harness
4
(Figure
6).
g212417
g215300

Advertisement

loading