Verifying The Installation; Hardware Installation Checklist - Huawei PDU8000 Quick Manual

Modular integrated pdc
Hide thumbs Also See for PDU8000:
Table of Contents

Advertisement

5. Connecting Signal Cables for the PDC.
When the MODBUS TCP protocol is used,
connect one end of the network cable to the FE
port in the PDC, and connect the other end to
the collector.
3

Verifying the Installation

3.1

Hardware installation checklist

No.
Check Item
The cabinet is clean, without redundant stubs, screws, or other debris inside
1
or at the copper bar to avoid short circuits.
2
The paint on the cabinet exterior is intact.
3
The cabinet door and lock work properly.
4
All labels are correct, clear, and complete.
The surrounding area of the cabinet contains no waste tape, cable ties, paper,
5
or packing materials.
6. Secure the cables to cable-routing board by
using cable ties.
7. (Optional) Cut proper cable inlets and
outlets in the rodent-proof meshes and
install the PDC top panel back. Seal the
cable inlets and outlets using firestop putty.
Position
of cable
ties in the
cabinet
7
Position
of cable
ties in the
cabinet
Result
□Yes □No
□Yes □No
□Yes □No
□Yes □No
□Yes □No

Advertisement

Table of Contents
loading

Table of Contents