4. TROUBLE SHOOTING
4.1 Trouble Test Set-up
Power on all of test equipment
-Connect PIF-UNION JIG or dummy battery to the DUT for power up.
-Connect mobile switch cable between Communication test set and DUT when you need to
make a phone call.
-Follow trouble shooting procedure
Copyright © 2009 LG Electronics. Inc. All right reserved.
Only for training and service purposes
-29-
- 33 -
4. TROUBLE SHOOTING
4.000V 0.0000A
LGE Internal Use Only