Download Print this page

Huawei SUN2000-75KTL Series Quick Manual

Solar inverter
Hide thumbs Also See for SUN2000-75KTL Series:

Advertisement

Quick Links

SUN2000-(75KTL, 100KTL, 110KTL, 125KTL) Series
Quick Guide
Issue: 19
Part Number: 31500HGH
Date: 2022-05-20
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

loading

Summary of Contents for Huawei SUN2000-75KTL Series

  • Page 1 SUN2000-(75KTL, 100KTL, 110KTL, 125KTL) Series Quick Guide Issue: 19 Part Number: 31500HGH Date: 2022-05-20 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Before installing the device, read the user manual carefully to get familiar with product information and safety precautions. Huawei shall not be liable for any consequences caused by the violation of the storage, transportation, installation, and operation regulations specified in this document and the user manual.
  • Page 3 (1) DC input terminal group 1 (PV1–PV8, (2) (Optional) Screw hole for DC switch 1 controlled by DC SWITCH 1) (3) DC switch 1 (DC SWITCH 1) (4) DC input terminal group 2 (PV9–PV14, controlled by DC SWITCH 2) (5) (Optional) Screw hole for DC switch 2 (6) DC switch 2 (DC SWITCH 2) (7) DC input terminal group 3 (PV15–PV20, (8) (Optional) Screw hole for DC switch 3...
  • Page 4: Installation Requirements

    Switch Description Component DC SWITCH The DC switch is ON and can automatically turn off for protection. The DC switch is ON but cannot automatically turn off for protection. The DC switch is OFF. RESET • When the DC switch automatically turns off for protection, the RESET button will be released.
  • Page 5 Installing a Solar Inverter • This quick guide describes how to install a solar inverter on a support. For details about wall- mounted installation, see the user manual. Position for binding the • The M12x40 bolt assemblies are delivered with the security Torx wrench solar inverter.
  • Page 6 2. (Optional) Install screws for locking DC switches. According to Australian standards, the screws for DC switches are delivered with solar • inverters. The screws are used to secure DC switches (DC SWITCH 1, DC SWITCH 2, and DC SWITCH 3) to prevent them from being turned on by mistake. For the model used in Australia, perform this step to meet the local standards.
  • Page 7: Connecting Cables

    Connecting Cables • Connect cables in accordance with the local installation laws and regulations. • To prevent poor cable connection due to overstress, leave enough slack before connecting the cables to the appropriate ports. Preparations • S and S are the conductor cross-sectional areas of AC power cables and PE cables respectively. •...
  • Page 8 4-pin Model (75KTL/100KTL/110KTL) Cable Description Conductor Cross- No. Cable Type Outer Diameter Sectional Area Outdoor cable and M10 OT/DT PE cable ≥ S/2 terminals Tracking system Three-core outdoor copper cable with 10 mm 15–18 mm power cable dual-layer protection • If you connect a ground cable to the ground point on the chassis shell and the neutral wire is not used, you are advised to use a three-core (L1,...
  • Page 9 Installing a PE Cable Reserved PE point • It is recommended that the PE cable of the solar inverter be connected to a nearby ground point. Connect the PE points of all solar inverters in the same array to ensure equipotential connections to PE cables.
  • Page 10 3. Remove the accessories and set them aside. 4. Select a crimping module according to the type of the AC output power cable. 4-pin Model 3-pin Model Multi-core Cable Single-core Cable...
  • Page 11 Removing the Rubber Rings from the Crimping Module Use scissors to cut off the joints of the rubber rings to remove them. All rubber rings are removed in the same way. Remove the corresponding rubber rings strictly according to the cable diameter range, and ensure that the crimping module is not damaged.
  • Page 12 Installing the AC Output Power Cable • This section describes how to install an AC output power cable for the 3-pin model. • The cable outer diameter can be measured using the ruler sticker in the maintenance compartment. • Ensure that the AC output power cable is secured. Failure to do so may cause the solar inverter to malfunction or damage to its terminal block by issues such as overheating.
  • Page 13 Single-core Connection Method The 32–36 mm cable is supported only by some models. Refer to the corresponding label to get the supported size. 3-pin Model (125KTL) Cable Connections Four-core cable Three-core cable Single-core cable...
  • Page 14 4-pin Model (75KTL/100KTL/110KTL) Cable Connections Four-core cable Four-core cable Five-core cable Three-core cable (including N) (including PE) Single-core cable Single-core cable (including N) (excluding N) Closing the Maintenance Compartment Door...
  • Page 15 Installing DC Input Power Cables Selecting DC Input Terminals When the DC inputs are not fully configured, the DC input terminals must meet the following requirements: 1. Evenly distribute the DC input power cables on the DC input terminals controlled by the three DC switches.
  • Page 16 Positive connector Positive metal contact H4TC0003 (Amphenol) Negative Click Ensure that the cable connector Negative metal contact cannot be pulled out after being crimped. Use a multimeter set Ensure that the to the DC position to locking nut is measure the DC secured.
  • Page 17 Installing the RS485 Communications Cable Pin Definitions of Communications Ports • The solar inverter supports RS485 communication and MBUS communication. If the MBUS communication mode is used, you do not need to connect the communications cable to the RS485-1 port. •...
  • Page 18: Verifying The Installation

    Connecting RS485 Communications Cables (4–8 mm Two-hole or Three-hole Rubber Plug) One or two Three communications communications cables cables One communications cable Verifying the Installation Acceptance Criteria The solar inverter is installed correctly and securely. The DC switches and downstream AC switch are set to OFF. All cables are connected correctly and securely.
  • Page 19: Powering On The System

    Powering On the System When LED2 is steady green (meaning that the inverter is grid-tied), do not turn on any DC switch. Otherwise, the inverter may be damaged because the insulation resistance is not detected. • Before turning on the AC switch between the solar inverter and the power grid, check that the AC voltage is within the specified range using a multimeter set to the AC position.
  • Page 20 Indicator Status (Blinking Fast: On for Description 0.2s and then Off for 0.2s; Blinking Slowly: On for 1s and then Off for 1s) PV connection Steady green At least one PV string is properly connected, indicator and the DC input voltage of the corresponding MPPT circuit is at least 200 V.
  • Page 21 WLAN module, Bluetooth module, or USB data cable to provide functions such as alarm query, parameter settings, and routine maintenance. • Access the Huawei app store (https://appstore.huawei.com), search for FusionSolar or SUN2000, and download the app installation package. Scenario in Which Solar Inverters Are Connected to the FusionSolar Smart PV Management System 1.
  • Page 22 • The screenshots in this document correspond to FusionSolar app version 5.7.008 (this app is available only on Android phones currently). • The screenshots in this document correspond to SUN2000 app version 3.2.00.013 (this app is available only on Android phones currently). WLAN •...
  • Page 23 Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China solar.huawei.com...