Table Of Contents - Hitachi C41V Instruction Manual

Table of Contents

Advertisement

1. Introduction ················································· 1
1.1
Features ·················································· 1
1.2
Principles of operation ··································· 1
1.3
Intended Use ·············································· 2
1.4
Components ················································ 2
1.5
Accessories (Option) ······································ 3
1.6
Construction ·············································· 4
2. Inspection before Use ········································ 5
2.1
Inspection for Appropriate Connection ····················· 5
2.2
Inspection for Material Surface ··························· 5
3. Operation Procedure ·········································· 6
3.1
Connection and Settings ··································· 6
3.2
Use of Sterile Puncture Adapter (EZU-PA5V) ················ 8
3.3
Display of Needle Guide Line ······························ 9
4. Cleaning, Disinfection and Sterilization ···················· 10
4.1
Point of use (Pre-cleaning) ······························ 11
4.2
Containment and transportation ··························· 11
4.3
Manual Cleaning and disinfection ························· 12
4.4
Drying ··················································· 13
4.5
Inspection ··············································· 13
4.6
Packaging ················································ 14
4.7
Sterilization ············································ 15
4.8
Storage ·················································· 16
5. Maintenance and Safety Inspection ··························· 17
5.1
Daily Inspection ········································· 17
5.2
Storage ·················································· 17
6. Safety Precautions ·········································· 18
7. Specifications ·············································· 19
7.1
Probe ···················································· 19
7.2
Sterile Puncture Adapter EZU-PA5V ························ 20
7.3
Suppliers List ··········································· 21
8. Disposal of the probe ······································· 21
CONTENTS
(5)
Page
Q1E-EP1363

Advertisement

Table of Contents
loading

Table of Contents