Hitachi NEXT Series Instruction Manual page 105

Oil-free rotary screw air compressor
Hide thumbs Also See for NEXT Series:
Table of Contents

Advertisement

Inspection of Controller and Fan Inverter
16
(The fan inverters are provided only with
Charge lamp (controller)
(Check that it is off.)
Air-Cooled
Charge lamp (fan inverter)
(Check that it is off.)
9. MAINTENANCE [How to Service the Air Compressor]
.)
Air-Cooled
①   T urn off the power and wait approximately 10
minutes. Next, remove the front door and then
remove the cover of control panel
②   C heck that the charge lights of the controller and fan
inverter are off. Check for abnormal overheat,
discoloration, abnormal odor, and contamination.
③   B low off the dust by dry air
④   D uring periodical maintenance, re-tighten the
terminals, check the conductor and insulator for
corrosion, and inspect/replace the cooling fan and
smoothing capacitor.
Contact the local HITACHI distributor/master dealer or
representative office for the detail.
103

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents