Connecting Cables To Battery Packs For Ups2000-H-6 Kva; Battery Maintenance - Huawei ESS-240V12-9AhBPVBA04 Quick Manual

Hide thumbs Also See for ESS-240V12-9AhBPVBA04:
Table of Contents

Advertisement

ESS-240V12-(9AhBPVBA04, 7AhBPVBA04) Battery
Pack
Quick Guide
3.4.3 Connecting Cables to Battery Packs for UPS2000-H-6
kVA
Connecting Cables to Battery Packs for a Single UPS2000-H-6 kVA
Figure 3-20 One UPS (model UPS2000-H-6 kVA) + four battery packs

3.5 Battery Maintenance

Before operating batteries, read through the battery user manual, safety
precautions, and correct connection methods provided by the battery
manufacturer.
Before installing and maintaining batteries, pay attention to the following points:
● Wrap tools with insulation tape to prevent electric shock.
● Wear protective goggles and take other necessary protective measures.
● Wear rubber gloves and protective clothing to prevent skin contact with
electrolyte in the case of electrolyte overflow.
● When moving batteries, do not place batteries upside down. Handle them
gently, and pay attention to personal safety.
● Keep the battery switch off during installation and maintenance.
Battery Maintenance Precautions
Issue 01 (2021-12-23)
NO TICE
Before battery maintenance, insulate tools such as wrenches. Do not place
any objects on the top of batteries.
Copyright © Huawei Digital Power Technologies Co., Ltd.
3 Installation
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ess-240v12-7ahbpvba04

Table of Contents