GE ApexPro Service Manual page 174

Telemetry server
Hide thumbs Also See for ApexPro:
Table of Contents

Advertisement

6-40
Parts Lists, Drawings and Replacement: Disassembly/Assembly
6.
Disconnect the ATX, serial port and USB connectors from the receptacles near
the back left corner of the main CPU board. Note the position and orientation of
the connectors for reassembly.
USB
Connector
7.
Disconnect the watchdog timer from the receptacle near the back left corner of
the main CPU board. Note the pin position and orientation of the watchdog
timer connector for reassembly.
ApexPro Telemetry Server
2001989-178
ATX Connector
Serial Port
Connector
Watchdog
Timer
Connector
098A
099A, 100A
Revision C

Advertisement

Table of Contents
loading

Table of Contents