Download Print this page
ABB CPS6000 Quick Start Manual
Hide thumbs Also See for CPS6000:

Advertisement

Quick Links

QUICK START GUIDE
This CPS6000 power system is a 23" shelf equipped with a Pulsar Edge Controller.
Single shelf system
Two shelf system
Start with Step A1 of the Two Shelf System Addendum on page 5.
Tools required:
Wire cutters and strippers
Cable crimpers
Torque wrench - 0-65 in-lb (0-10Nm)
Step 1 - Mount Shelf
Attach shelf to the frame using a minimum of four screws (two on each side) - 12-24 (provided).
Step 2 - Connect AC Inputs
Use a pair of needle nose pliers to
remove the divider between the
individual rectifier
Page 1
© 2021 ABB. All rights reserved.
Sockets - 5/16", 7/16, etc.
Screwdrivers- Philips #1 and #2, Flat small
Snap Loose
Plastic
Divider With
Pliers

Advertisement

loading

Summary of Contents for ABB CPS6000

  • Page 1 QUICK START GUIDE This CPS6000 power system is a 23” shelf equipped with a Pulsar Edge Controller. Single shelf system Two shelf system Start with Step A1 of the Two Shelf System Addendum on page 5. Tools required: • Wire cutters and strippers •...
  • Page 2 J5 LAN - Connect to Ethernet network. Step 8 - Install 1-Wire Battery Temp and Voltage Monitor per Galaxy Pulsar Edge Controller Quick Start Guide - Optional Connect 1– Wire Battery Temp and Voltage Monitor to J2 Page 2 © 2021 ABB. All rights reserved.
  • Page 3: Step 6 - Rectifier Installation

    Firmly push the rectifier into the rectifier slot until the latch pops most of the way up. Push the latch into the latched position. Press Latch/ Handle Release Button IN Latch/Handle in Latched Position Latch/Handle Springs Out Part Way Press Latch/ Handle Page 3 © 2021 ABB. All rights reserved.
  • Page 4 Controller, Control Panel - Active Bottom Shelf Signal connections not used, Controller not installed, Control Panel - Inactive (unpowered) Shelf to Shelf Signal Cable 1 2 3 Circuit Board Shelf Address ID Jumpers (2) Page 4 © 2021 ABB. All rights reserved.
  • Page 5: Reference Documents

    Installation Environment - Install in Network Telecommunication Facilities, OSP, or where NEC applies. • Battery return may be either Isolated DC return (DC-I) or Common DC return (DC-C). Reference Documents These document s are available at abbpowerconversion.com Page 5 © 2021 ABB. All rights reserved.
  • Page 6 – in whole or in parts – is to purchase orders, the agreed particulars shall prevail. forbidden without prior written consent of ABB. ABB does not accept any responsibility whatsoever for potential errors or possible lack of information in this Copyright©...