Download Print this page
ABB CPS6000 Quick Start Manual
Hide thumbs Also See for CPS6000:

Advertisement

Quick Links

QUICK START GUIDE
CPS6000 Power System
For systems with rear access AC terminal box.
The shelf is installed with a minimum gap of 3/4 inch below the system to allow proper airflow. Attach the CPS
shelf to the frame using a minimum of twelve (six on each side) of the 12-24 screws included with the shelf.
Information – Tools Required
Wire cutters and strippers
Heat shrink gun
Torque wrench (0-240 in-lb / 28 Nm)
Document – 850025053
Page 1
© 2023 ABB. All rights reserved.
Digital meter, +/- 0.02%
Screw Drivers (#1 and #2 Phillips)
Cable crimpers
CPS6000_Series II External Distribution_QSG
5/16"and 3/8" nut drivers and sockets
Version 2.0

Advertisement

loading

Summary of Contents for ABB CPS6000

  • Page 1 5/16”and 3/8” nut drivers and sockets • • Heat shrink gun Screw Drivers (#1 and #2 Phillips) • • Torque wrench (0-240 in-lb / 28 Nm) Cable crimpers Document – 850025053 Page 1 © 2023 ABB. All rights reserved. CPS6000_Series II External Distribution_QSG Version 2.0...
  • Page 2 Caution: When routing AC cables ensure cable does not come in contact with sharp or rough surfaces that may damage insulation and cause a short circuit. Make sure cable does not come in contact with any pinch points such as doors. Page 2 © 2023 ABB. All rights reserved. CPS6000_Series II External Distribution_QSG Version 2.0...
  • Page 3 3 - pole Adapter bus for 200-250A breakers; Centered connection (order 2 per 3 pole breaker to 850021955 accommodate load and return lugs.) Page 3 © 2023 ABB. All rights reserved. CPS6000_Series II External Distribution_QSG Version 2.0...
  • Page 4: Step # 4 - Controller Connections

    Refer to the Pulsar Plus Product Manual for issues like web pages, craft port and changes to settings. Most functions in software are intuitive by referring to the menu map listed in the detail Manual Page 4 © 2023 ABB. All rights reserved. CPS6000_Series II External Distribution_QSG Version 2.0...
  • Page 5 Full configuration details and Menu structure are available in the Product Manual. Information: Controller Menu Page 5 © 2023 ABB. All rights reserved. CPS6000_Series II External Distribution_QSG Version 2.0...
  • Page 6 AC/Multiple AC Fail (ACF) R2_C BK-W Rectifier Fail (RFA) R3_C BL-R Very Low Voltage R4_C Fuse Alarm (External FAJ2) R5_C High Voltage (HV) R6_C Unassigned (User Configurable) R7_C R-BK Page 6 © 2023 ABB. All rights reserved. CPS6000_Series II External Distribution_QSG Version 2.0...
  • Page 7: Change History

    Change History (excludes grammar & clarifications) Version Date Description of the change 07/2012 Initial release 07-11-2023 Updated as per ABB template Page 7 © 2023 ABB. All rights reserved. CPS6000_Series II External Distribution_QSG Version 2.0...
  • Page 8 – in whole or in parts – is to purchase orders, the agreed particulars shall prevail. forbidden without prior written consent of ABB. ABB does not accept any responsibility whatsoever for potential errors or possible lack of information in this Copyright©...