Mitsubishi Electric AE-200A Instruction Book page 18

Air conditioning control system, centralized controller, integrated centralized control web
Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

(3) Enter the user name and the password in the login screen, and click [Login]. A screen that shows the operation
status of the air conditioning units will appear.
The table below shows the default user names, passwords, and functions that are available for building
managers, tenant managers, and general users.
User
Terminal
Building
manager
• PC
• Tablet
Tenant
manager
• PC
General
• Tablet
user
• Smartphone
Note: Tenant managers and general users are not registered at the time of shipment. Up to 200 tenant managers and 2,000
general users can be registered. You can log in with building manager privileges and then use the user management
function to set the air conditioning unit groups that can be monitored and operated by each user. Refer to 2-5-2 "User
registration" in Chapter 2 for details.
Note: It is recommended to change the default user name and password so that the users other than the building managers will
not be able to change the settings.
WT07996X02
Default user
Default
name
password
administrator
admin
18
Available functions
• Brief display of all floors
Home
• Display of electric energy consumption
• Display of error status
• Display of floor layouts and monitoring/
operating the operation status on the
group list
Monitor/
• Display of measurement status
Operation
• Display of AHC status
• Monitoring/operating the HWHP operation
status
• Energy use status
Energy
• Ranking
Management
• Monitoring target values
• Peak Cut Control status
• Changing today's schedule
• Weekly schedule setting 1–5
Schedule
• Annual schedule setting
• Date range setting for weekly schedule
• Display of units in error
• Display of unit error log
Notice
• Display of communication error
• Display of filter sign
• Screen display setting
• User registration
Settings
• Current time setting
• License registration
• Error notification e-mail log
• Monitoring outdoor unit operation status
Maintenance
• Monitoring indoor unit free contact
• Gas Refrigerant Amount Check
• CSV output (only PC)
• Monitoring/operating the operation status
Monitor/
on the group list
Operation
• Monitoring/operating the HWHP operation
status
• Energy use status
Energy
• Ranking
Management
• Monitoring target values
• Changing today's schedule
Schedule
• Weekly schedule setting 1–5
• Annual schedule setting
• Monitoring/operating the operation status
Monitor/
• Monitoring/operating the HWHP operation
Operation
status (excluding smartphone)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50aEw-50aAe-200eAe-50eEw-50e

Table of Contents